Sector Plate Gallery
There are just too many construction photos for a single gallery so I have decided to split them up. This one is for the sector plate construction.
Sector plate and copper clad circuit board before fixing in place
Sector plate with the copper clad circuit board fixed in place
Insulation gaps cut in the underside of the copper clad circuit board to avoid any unforeseen ‘shorts’ when the track was laid. The meter was used to confirm there were no ‘shorts’.
Checking the clearances on the sector plate
Checking the clearances on the sector plate
Checking the clearances on the sector plate
Checking the clearances on the sector plate
Checking the clearances on the sector plate
Laying the cork on the sector plate
Laying the cork for the track bed
Sector plate alignment bolts under construction. The bolt is silver steel, the operating arm is brass strip and the guides are round section brass tube inside square section brass tube. One of these is seen in preparation on the right.
Sector plate alignment bolts finished
Cutting the alignment bolt base plate to suit the angle of the sector plate.
First sector plate alignment bolt installed
First sector plate alignment bolt installed
First sector plate track and alignment bolt installed
First sector plate track and alignment bolt installed
All the sector plate tracks and alignment bolts in place
All the sector plate tracks and alignment bolts in place
All the sector plate tracks and alignment bolts in place
The sector plate wiring finished and ready for testing.
The sector plate wiring finished and ready for testing.
Click here to go back to the sector plate page
or
Click here to go back to the main Tony’s Forest page