progress 6

Part-built ore bins with a test mock-up of the chute. These will have a fixed section attached to the bottom of the ore bin and a lifting section to allow the locos to pass. i guess I will have to interlock the track section to stop the locomotives from crashing into them when they are down.

Part-built ore bins with a test mock-up of the chute. These will have a fixed section attached to the bottom of the ore bin and a lifting section to allow the locos to pass. i guess I will have to interlock the track section to stop the locomotives from crashing into them when they are down.

Part-built ore bins with a test mock-up of the chute. These will have a fixed section attached to the bottom of the ore bin and a lifting section to allow the locos to pass. i guess I will have to interlock the track section to stop the locomotives from crashing into them when they are down.

Both comments and trackbacks are currently closed.